OUR PROCESS
Pre-Walk
Every project starts with a pre-walk to confirm scope, layout, and equipment locations, and to talk through any challenges before they become problems on site.
1
Rough-In
Ducting, line sets, drains, and wiring are installed to code with close attention to detail, coordinated around the framing, electrical, and plumbing already on site.
2
Trim-Out
Diffusers, grilles, and thermostats go in, followed by equipment startup and the first round of filters, so every system is running before the walkthrough.
3
Orientation
James walks the homeowner or builder through system operation, answers questions, and provides documentation and maintenance information for every piece of equipment.
4
Completion
A second round of filters is installed, equipment is tested, performance data is logged, and a final walkthrough confirms everything is ready for occupancy.
5
Support
REDS responds quickly to punch-list items, inspection requests, and warranty work, with equipment registered on the owner's behalf for the full warranty duration.